Museum of the Future

Media server operator during daily shows for a VIP audience.

I was part of the media server operator team the Museum of the Future during its opening event and initial VIP program.

For the opening event, I delivered a 360° projection dome adjacent to the main VIP area.
From the day after the opening onward, I ran the main facade projection mapping for a two-week VIP program.

The role involved daily show operation, last-minute content changes, and ongoing recalibration of a large-scale projection system to ensure consistent visual quality across projection and LED surfaces.

Results

Technical

Dome